Directional Indicators are installed to safely lead pedestrians along an intended pathway free of obstacles and will often terminate at a pad of Warning Tactile Indicators.
Installation
The relevant standards governing correct layout and orientation for the Tactile directional will be complied with and a drilling template positioned and taped to the substrate to avoid movement while drilling grid pattern.
The holes are individually drilled and the template removed. Dust and debris is vacuumed from the holes and a quality two part adhesive is injected into each cavity. The studs are fitted and tapped, the adhesive takes 12-15 hours to cure completely.